Search

EDSA JOB ADVERTS

Design, Supply and Installation of 66 kV sub-transmission line from Kenema to Kailahun and associated Substation at Kailahun

SuperUser Account 0 59 Article rating: No rating

Employer: Electricity Distribution and Supply Authority (EDSA)

Project: Enhancing Sierra Leone Energy Access Project (ESLEAP)

Contract title: Design, Supply and Installation of 66 kV sub-transmission line from Kenema to Kailahun and associated Substation at Kailahun

Country: Sierra Leone

Grant No.: IDA-D7690

RFB No: SL-EDSA-502236-CW-RFB

Issued on: 26th September 2025

1.         The Government of the Republic of Sierra Leone has received financing from the World Bank toward the cost of the Enhancing Sierra Leone Energy Access Project (ESLEAP), and intends to apply part of the proceeds toward payments under the Contract for Design, Supply and Installation of 66 kV sub-transmission line from Kenema to Kailahun and associated Substation at Kailahun. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing, except for those payments, which the contract provides to be made through letter of credit.

2.         The Electricity Distribution and Supply Authority (EDSA) now invites sealed Bids from eligible Bidders for:

Design, Supply and Installation of 66 kV sub-transmission line from Kenema to Kailahun and associated Substation at Kailahun

  • Approximately 120 km of 66kV sub-transmission line (steel lattice towers, single circuit structure, single circuit stringing, 265mm2 AAC conductor)
  • Extension at Kenema substation of outdoor 66kV switchgear for one 66kV outgoing feeder bay with associated metering, protection and control
  • 66kV outdoor switchgear and busbar system at Kailahun Substation (one feeder incomer bay, one outgoing Power Transformer Bay, busbar system)
  • One 66/33/11kV, 20/25MVA Power Transformer at Kailahun Substation
  • 33kV, 25kA for 3s, 630A Single Bus bars Air Insulated Switchgear at Kailahun Substation (two feeder outgoing cubicles, one transformer cubicle, one bus sectionalizer cubicle, one measuring cubicle)
  • Metering, protection and control at Kailahun Substation
  • AC and DC supply at Kailahun Substation
  • Power, auxiliary & control cables & accessories at Kailahun Substation
  • Civil works at Kailahun Substation (new substation building, guard house, store, workshop, customer servi

Request for Expression of Interest (EOE): Consulting Services for the Preparation of Resettlement Plan (RP)

Reference No: SL-EDSA-502227-CS-LCS

SuperUser Account 1 34 Article rating: 5.0

The Government of Sierra Leone has received financing from the World Bank towards the cost of the Enhancing Sierra Leone Energy Access Project and intends to apply part of the proceeds for consulting services.  

The consulting services (“the Services”) include “Preparation of Resettlement Plan (RP)”. The estimated level of effort (professional staff-months) for this assignment is Eight (8) man weeks. Implementation is expected to commence on the 17th October 2025 and ends on the 31st December 2025.

The objective of this assignment is to prepare a Resettlement Plan (RP) for the Enhancing Sierra Leone Energy Access Project (ESLEAP) in line with the World Bank Environmental and Social Framework requirements on Land Acquisition and Involuntary Resettlement (ESS 5) and relevant national laws and regulations to ensure the adverse impacts resulting from physical and economic displacement due to project activities are adequately mitigated and the livelihood of Project Affected Persons (PAPs) are restored. The RP will include detailed information on PAPs whose livelihoods are likely to be adversely affected by the project activities, both during construction and operation.

The detailed Terms of Reference (TOR) for the assignment can be requested via email, using the following email address: [email protected] , copying [email protected], [email protected],  [email protected], [email protected]  

RSS

CONTACT US

Feel free to contact us and find out more about our services.

RECENT PROJECTS

Check out our carefully crafted products and let us exceed your expectations.

RECENT COMMENTS

"It's minimal not just sleek!
"Mission accomplished. It's classic!"


EDSA

The Mission of EDSA is to develop a modern and efficient national electricity distribution infrastructure that meets the energy requirements for industrial, commercial and domestic customers through upgrading and expansion of the existing network, expansion of prepaid metering systems and training of the staff for effective utility management and skilled maintenance of the national distribution and supply network.

image
Copyright 2026 by EDSA Terms Of Use Privacy Statement
Back To Top